Project Details
Woolshed Road STAPYLTON
Category: Industrial Warehouse
Client: Salmon Earthmoving
Date: 2008
Project Description
Description: 1 X large Wharehouse with internal panel wall 2 internal rooms
- Tiltcon team worked closely with the architects and structural engineers, on site P&D foreman, local suppliers and subcontracts, to accomplish the 35 Panel building.
- The project had 5 large casting beds, allowing to stack all the layers of panels, which was lifted by a 20t crane over 2 days.
- Duration time was 2 weeks. (casting beds to Panel Lift)
- Poured internal floor slab approx m3
Service provided:
- casting beds
- formwork
- reo fixing
- concrete place and finish
- panel lifting
- panel bracing
- joint sealing
- Earthworks