St Andrew’s Ferny Grove, Prep Refurbishment and extensions

//St Andrew’s Ferny Grove, Prep Refurbishment and extensions
Project Details

The creation of a new learning space for Prep students at St Andrew's

Category:

Client: St Andrew's Ferny Grove

Project Description
Partial demolition of existing buildings was necessary to connect the learning spaces
Partial demolition of existing buildings was necessary to connect the learning spaces
Removal of external brick and clad walls was necessary to create new learning spaces
Removal of external brick and clad walls was necessary to create new learning spaces
A new concrete floor slab was built to connect the two existing structures
A new concrete floor slab was built to connect the two existing structures
To create a dry area connecting the two buildings, a new roof was installed
To create a dry area connecting the two buildings, a new roof was installed
Extensions to existing buildings increased the GLA and better serviced the school's needs.
Extensions to existing buildings increased the GLA and better serviced the school’s needs.
An extension to the existing prep toilets required additonal roofing to match the existing roof line
An extension to the existing prep toilets required additonal roofing designed to matched  the existing roof line
In addition to existing toilets, a new toilet facility was built that was accessed easily from within the prep classrooms
In addition to existing toilets, a new toilet facility was built that was accessed easily from within the prep classrooms
The additional space provided increased usable learning areas that opened out to a prep-specific and fully fenced grass area
The additional space provided increased usable learning areas that opened out to a prep-specific and fully fenced grass area